Main Description |
The following checks can be carried out for the workplace:
-
Are the required PCs, printers, workplaces, telephone lines, routers, et cetera present and correctly installed?
-
Is the required system software installed?
-
Is the system software the right version?
The following can be carried out for the test environment:
-
Has access to the test environment been provided?
-
Has access to the application been provided?
-
Has access to the database been provided?
-
Has the database been filled with the correct data (e.g. a copy of production)?
-
Have all the authorisations been provided?
The following checks can be carried out for the test tools:
-
Are all the licences operational?
-
Can the test tool be accessed from every workplace?
-
Is the connection between test tool and test object operational?
|